MIL-PRF-44423A
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of this specification.
b. Class required (see 1.2).
c. Issue of DODISS to be cited in the solicitation, and if required, the specific issue of
individual documents referenced (see 2.2.1 and 2.3).
d. When first article is required (see 3.1, 4.2, and 6.3).
e. Width required.
f. Length required.
g. Levels of preservation and packaging (see 5.1).
6.3 First article. When a first article is required, it shall be inspected and approved under the
appropriate provisions of FAR 52.209. The first article should be a preproduction sample.
The contracting officer should specify the appropriate Class of first article and the number of
units to be furnished. The contracting officer should include specific instructions in all
acquisition instruments regarding arrangements for selection, inspection, and approval of the
first article.
6.4 Standard sample. For access to the standard sample (see 3.2), address the contracting
activity issuing the invitation for bids.
6.5 Subject term (key word) listing.
Five Soldier Crew Tent
Tentage
Custodians:
Preparing activity
Army - GL
DLA-CT
(Project 8305-0616)
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business